V8 forced concrete mixer pump Product Specification:
(1)imported hydraulic pump, powerful, stable performance ;
(2) Siemens and Schneider brand electric control system, quality assurance.
(3)pumping vertical distance 70meters
(4)pumping horizontal distance 200meteres
Product Feature:
(1) Better stability
The pump adopts Kawasaki hydraulic pump and import group valve to better stability and longer service life.
(2) Strong transfer capability
With Dia.200mm transfer pipe, the pump can transfer more concrete and deal with aggregate diameter in 40mm.
(3) Lager hopper
With 0.65m3 hopper, the dump can be high capability and less surplus.
(4) High efficiency
25m3/h ~ 30m3/h output.
(5) Telescoping , space saving
The whole mixing system can be telescoping by hydraulic support leg, also offer room for discharging and maintenance.
(6)Mixing evenly
V8 is with double shaft mixing, more evenly than roller mixing.

Parameter:Linuo mixer pump items | Model No. | V8 |
Actual output | m3/h | 25 |
Theoretical output | m3/h | 30 |
Max pressure on concrete | Mpa | 8 |
The type of distribution valve | | "S" tube valve |
Delivery cylinder | mm | 200 |
Oil tank capacity | L | 170 |
Outlet opening diameter | mm | 180 |
Inner dia of delivery pipe | mm | 125 |
Power | KW | 54 |
Max diameter of aggregates | mm | 40 |
Maximum delivery horizontal distance | m | 200 |
Maximum delivery Vertical distance | m | 70 |
Capacity of charge hopper | L | 500 |
Capacity of discharge hopper | L | 650 |
Diameter of drum | mm | 1440 |
Drum rotary speed | r/m | 15 |
Mixing time | s | 15 |
Dimension | mm | 7285*2300*3200 |
Weight | kg | 12000 |
Construction Case:




Our Services:
As a professional company, we will serve you with professional before-sale service and 24 hours a day a week after-sale services.
We promise as following:
1. Technical service
2. On-site training
3. All day after sale service
4. Providing Linuo's fittings
5. Engineers available to service machinery overseas

FAQ:
Q1: What is your payment method?
A: T/T payment
Q2: How long is the delivery time for my order?
A: That depends on what and how many you ordered. Within 7 days supplied from stock, and 15 days is necessary for OEM products and special shaped products..
Q3: What is your shipping method?
A: By sea.
Q4: How do you do quality control?
A: We have our own experienced QC. There will be strict inspection and testing for every order before shipping out.
Q5 :Can I have my own LOGO on it?
A: Of course you can.OEM service is available.You can send your LOGO to me by email. We'll make you satisfied.
Q6: What is your competitiveness? How can I trust your company?
A: - We are Manufacturing company.Working with us, you can lower your cost for concrete pump and its spare parts , as we are factory direct and have the economy of scale.Welcome to ask if you need more details !Contact: Connie Zhang
Tel:+86 18274828254
Changsha Linuo Machinery Co,tld.